References
REFERENCES (Power Industry)
Project: RomPetrol Refinery – Cogeneration Power Plant
Location: Romania
Contractor: Calik Energy
Date: 2022 – 2023
PAR’s scope: SWAS (Steam-Water Sampling and Analysis Systems)
Project: Rehabilitation of Kemerkoy (3 Units) TPP and Yenikoy (2 Units) TPP
Location: Turkey
Contractor: General Electric (GE) – Garanti Koza Energy consortium
Date: 2018 – 2023
PAR’s scope: SWAS (Steam-Water Sampling and Analysis Systems)
CDS (Chemical Dosing Systems)
Project: Mary-3 1574 MW Combined Cycle Power Plant
Location: Turkmenistan
Contractor: Calik Energy
Date: 2017 – 2018
PAR’s scope: SWAS (Steam-Water Sampling and Analysis Systems)
CDS (Chemical Dosing Systems)
Project: Cenal 1320 MW Thermal Power Plant
Location: Turkey
Contractor: ABB Electrics
Date: 2016 – 2017
PAR’s scope: CDS (Chemical Dosing Systems)
Project: Gardabani 230 MW Combined Cycle Power Plant
Location: Georgia
Contractor: Calik Energy
Date: 2014 – 2015
PAR’s scope: SWAS (Steam-Water Sampling and Analysis Systems)
CDS (Chemical Dosing Systems)
Project: Tupras Refinery – Modernization of Power Plant and Utilities (9 Units)
Location: Turkey
Contractor: ABB Electrics
Date: 2011 – 2012
PAR’s scope: SWAS (Steam-Water Sampling and Analysis Systems)
Project: Navoi 478 MW Combined Cycle Power Plant
Location: Uzbekistan
Contractor: Calik Energy
Date: 2011 – 2012
PAR’s scope: SWAS (Steam-Water Sampling and Analysis Systems)
Project: Surgut 800 MW Combined Cycle Power Plant
Location: Russia
Contractor: Gama Power Systems
Date: 2009 – 2010
PAR’s scope: CDS (Chemical Dosing Systems)
Project: Shatura 400 MW Combined Cycle Power Plant
Location: Russia
Contractor: Gama Power Systems
Date: 2008 – 2009
PAR’s scope: SWAS (Steam-Water Sampling and Analysis Systems)
CDS (Chemical Dosing Systems)
